400,400 Pound Boiler Lifts

Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system that was setup outside of the plant. The boilers were lifted and trans-loaded onto 12-line double-wide Scheuerle SPMTs and transported into the Southwest petrochemical refinery through a very congested unit. 

Deep South then set them onto their foundations using two 500-ton Liebherr LTM 1400-7.1s and a 265-ton Liebherr LTM 1220-5.1. Each boiler weighed 400,400 pounds and was 52’ long, 13’ wide, and 26’ high. 

  • Equipment Used

    • Hydraulic Gantries
    • Scheuerle SPMT
    • Liebherr LTM 1220-5.1/5.2
    • Liebherr LTM-1400 7.1
  • Services Used

  • By the Numbers

    • 3 Boilers weighing 400,400 lbs
    • Measuring 52’ x 13’ x 26’
Boiler Lift Project
Boiler Lift for Petrochemical
500-ton Liebherr LTM
12-line double-wide Scheuerle SPMTs
Setting Boilers with the Liebherr LTM

Related Projects

Tugboat Transport Services

Scheuerles Haul 750 Ton Tugboat

View Project
Scheuerles Haul 750 Ton Tugboat

Deep South was contracted to transport a 750-ton tugboat.

Storage Tank Lift Services

New Orleans Coffee Plant

View Project
New Orleans Coffee Plant

Deep South was contracted to lift and set the top 3 decks of a tugboat wheel house.

300T Offshore Living Quarters Lift

View Project
300T Offshore Living Quarters Lift

This 300T living quarters module was installed onto an offshore support ship using the Terex Demag CC-2800. 

A successful job is built on precise planning and safe execution. request a quote