400,400 Pound Boiler Lifts

Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system that was setup outside of the plant. The boilers were lifted and trans-loaded onto 12-line double-wide Scheuerle SPMTs and transported into the Southwest petrochemical refinery through a very congested unit. 

Deep South then set them onto their foundations using two 500-ton Liebherr LTM 1400-7.1s and a 265-ton Liebherr LTM 1220-5.1. Each boiler weighed 400,400 pounds and was 52’ long, 13’ wide, and 26’ high. 

  • Equipment Used

    • Hydraulic Gantries
    • Scheuerle SPMT
    • Liebherr LTM 1220-5.1/5.2
    • Liebherr LTM-1400 7.1
  • Services Used

  • By the Numbers

    • 3 Boilers weighing 400,400 lbs
    • Measuring 52’ x 13’ x 26’
Boiler Lift Project
Boiler Lift for Petrochemical
500-ton Liebherr LTM
12-line double-wide Scheuerle SPMTs
Setting Boilers with the Liebherr LTM

Related Projects

Tugboat Transport Services

Scheuerles Haul 750 Ton Tugboat

View Project
Scheuerles Haul 750 Ton Tugboat

Deep South was contracted to transport a 750-ton tugboat.

Deep South Crane

Dismantling and Relocating A Petrochemical Facility

View Project
Dismantling and Relocating A Petrochemical Facility

Deep South was contracted to dismantle and relocate 9 vessels from a petrochemical plant using a combination of barging, heavy transport, and heavy lift services.

660 Ton Heavy Lift Crane

Lifting the Dome

View Project
Lifting the Dome

Using the 660-ton Demag CC-2800-1, Deep South successfully set this 244’ in diameter geodesic dome weighing approximately 145,000 pounds.

A successful job is built on precise planning and safe execution. request a quote