Dismantling and Relocating A Petrochemical Facility

This project included two separate scopes of work. Deep South was originally contracted to dismantle and relocate 9 vessels from a petrochemical plant. The vessels were barged, rolled off, and staged at their new location. 

Deep South returned a year later to transport and set the vessels at their final location in the Southwest. The vessels ranged in weight from 82,000 pounds to 1,100,000 pounds. Using 36 lines of Scheuerle SPMTs, the vessels were transported to the crane hook for lifting into final position.

Pictured here is the largest vessel weighing 1,100,000 pounds, being lifted by the 1,800-ton VersaCrane TC-28000 and the 440-ton Terex-Demag CC-2400-1 as the tail crane.

Deep South Employees
Deep South Crane Heavy Equipment
Deep South Crane Heavy Haul

Related Projects

turnkey lift and transport

Gulf Coast Turnkey Transport and Lift of Four Towers

View Project
Gulf Coast Turnkey Transport and Lift of Four Towers

Deep South was contracted to provide turnkey services that included: transport, barging, and setting four towers.  

Flare Stack Lift

View Project
Flare Stack Lift

Deep South Crane and Rigging was contracted for a heavy lift project in Norco, Louisiana.  The scope of work required for this lift included lifting two sections of a flare stack and the flare tip.  

caustic tower lift

Caustic & PreFrac Tower Lift

View Project
Caustic & PreFrac Tower Lift

Deep South Crane and Rigging was recently contracted by a southeast petrochemical plant as part of a major pre-turnaround project.  In order to de-bottleneck ethylene production, Deep South erected a caustic tower and a prefrac tower.