Texas Tourist Bureau Installation

Highlighting Deep South’s capability to provide services for small commercial projects, Deep South removed and installed an air conditioner at the Texas Tourist Bureau in Orange, Texas. Pictured here is the 235-ton Liebherr LTM1200-5.1.


Related Projects

Act 100 Magazine Cover

A Marathon Job, Literally

View Project
A Marathon Job, Literally

As seen in American Cranes and Transport Magazine

Transforming a 200-acre sugarcane field in Garyville, LA into a state-of-the-art refinery required a $3.8 billion investment and the work of a cadre of contractors with expertise that spanned the entire spectrum of engineering, construction, and rigging.  Construction on the Marathon GME project started in March of 2007, and by December of 2009 the refinery was mechanically complete.

reactor lift and transport

Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off

View Project
Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off

Deep South was contracted to deliver a 750,000-pound reactor to a refinery in northern Illinois.  The navigable waterway, a highly-trafficked 125-foot wide canal, required a side roll-off.

Deep South Employees

Specialty Ramps Save Client Money

View Project
Specialty Ramps Save Client Money

Our Demag CC-6800 set 4 vessels into final position, traveling with the full load on the hook and utilizing Deep South’s specialty ramps. 

A successful job is built on precise planning and safe execution. request a quote